# Access Paths

**URL:** <https://discourse.agopengps.com/t/access-paths/8200>\
**Category:** Feature requests\
**Created:** [27 January 2022 23:03 UTC](https://discourse.agopengps.com/t/access-paths/8200 "2022-01-27T23:03:52Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Reed](https://discourse.agopengps.com/letter_avatar_proxy/v4/letter/r/9de0a6/32.png) [@Reed](https://discourse.agopengps.com/u/Reed)\
**Post date:** [27 January 2022 23:03 UTC](https://discourse.agopengps.com/t/access-paths/8200/1 "2022-01-27T23:03:52Z")

</div>

I have been taking a look into the tram line feature in AgOpenGPS and have been wondering what it would take to modify it for creating access paths in the field.

What I mean by access paths is after a set number of swaths, the AB line is shifted over a set distance to create a driveway. I have attached a picture that shows how we leave irrigation driveways in the field that are 20 swaths apart.

 ![Access Paths Example](https://discourse.agopengps.com/uploads/default/original/2X/a/ab5a3ae0e6d608f8d25c3b204625ba70810c095a.jpeg)

I though I would see if anyone else has use for a feature like this or if it has already been done.

Any thoughts on this would be appreciated.

Thanks  
Reed
